Termin realizacji Opis
2008 - 2009

Adamów Power Plant - Upgrade of fire detection installation, for ZE PAK S.A.

2008 - 2009 Pątnów Power Plant – Upgrade of fire detection installation, for ZE PAK S.A.
2007 - 2009 Konin Power Plant – Delivery and building of T4 unit transformer 110MVA, for ZE PAK S.A
2008 Zduńska Wola Heat and Power Plant – execution of 15 kV low voltage cable terminal
2008 - 2009 Tauron EnergiaPro – 110/20 kV “Konrad” Power Station – delivery, assembly and start-up of 20 kV switching substation and earth-fault compensation system, for Tauron EnergiaPro S.A.
2008 - 2009 Pątnów Power Plant – steam pipeline and return condensate to “ATLAS” gypsum reprocessing factory – delivery, assembly and start-up of automation system and electrical installations, for PAK SERWIS Sp. z o.o.
2008 Tauron EnergiaPro – 110/20 kV “Staszica” Power Station – design documentation – upgrade of secondary circuit of two 110 kV fields, for Tauron EnergiaPro S.A.
2008 Tauron EnergiaPro – 110/20 kV “R-Słotwina” Power Station – upgrade of secondary circuit of two 110 kV fields, for Tauron EnergiaPro S.A.
2008 PCC “Rokita” – assembly of automation in Heat and Power Plant, for ABB Poland